space:remont [2024/04/30 10:16] – restrukturyzowane, żeby wrzucić ciężki wojuspace:remont [2024/05/18 12:33] (current) – [welding/grinding workshop] pl0myk
Line 23: Line 23:
 5. Podpięcie innego kranu nad zlewem (ask [[people:pl0myk:start]] for tutorial how to) 5. Podpięcie innego kranu nad zlewem (ask [[people:pl0myk:start]] for tutorial how to)
  
-6. Kibel_IoT by [[people:gro]] and [[people:pl0myk:start]] , easteregg, wyświetlacze stanu kibla i połączenie kibla z windą.+6. Kibel_IoT by [[people:gro]] and [[people:pl0myk:start]] , muzyczka, wyświetlacze stanu kibla i połączenie kibla z przyciskiem od windy.
  
  
 +
 +
 +
 +===== Warsztat cieżki =====
 +
 +  * electrical wiring must be remade, need more outlets in welding and woodworking zones
 +  * clothes go into a locker to be situated between server room and the rack with museum, where arcade machine currently sits
 +  * arcade machine to be exposed somewhere near central column, next to the heavy workshop doors
 +  * in the workshop, draw yellow boxes on the floor marking the width of an europallet (800×1200 mm) (pl0myks opinion: yellow box minimum width 1000mm wide)
 +  * curtains dividing welding/grinding shop
 +    * keep the specific kind of dust contained to the respective section: wood in wood, metal+oil in metal
 +    * opaque/UV-proof, so people outside won't see the arc
 +
 +==== woodworking shop near elevator ====
 +
 +up to about first row of columns
 +
 +  * new rack for wooden beams (done by woju and pl0myk)
 +  * dust extractor on the column, hanged from the wall
 +    * horizontal ducts high on the wall, branched to every woodworking machine
 +    * branch for handheld sanders should also have power cable with twistlock plug/receptacle
 +    * it should be possible to place a cart below the dust bag, to move the bag do elevator, to ramp and drop from the ramp straight into a bin
 +  * combination machine (table saw + router/moulder table + jointer + planer + horizontal boring)
 +    * on wheels, to be moved against the wall when not in use, but possible to move to around the centre of the section and possible go approach from all sides
 +  * belt grinder will remain in this section, but needs to have water tank in front of it, below the vertical section of the belt, permanently attached (samla on a chair is not enough)
 +  * move 
 +
 +==== welding/grinding workshop ====
 +
 +as it currently is (already after changes), but:
 +
 +  * extend exhaust to welding table (there is connection on the ceiling)
 +  * make clamps hangers (done by pl0myk)
 +
 +==== machine shop ====
 +
 +  * avia goes where bridgeport was standing
 +  * PMMA sheets from wood sheet cart go between lasercutter and the leg of the rack (done)
  
  
Line 39: Line 77:
     - Po nałożeniu pierwszej warstwy należy poczekać, aż wyschnie, zanim nałoży się drugą warstwę     - Po nałożeniu pierwszej warstwy należy poczekać, aż wyschnie, zanim nałoży się drugą warstwę
   - Po malowaniu wrzuć wałek do kubła, zostaw tackę i uchwyt do wyschnięcia!   - Po malowaniu wrzuć wałek do kubła, zostaw tackę i uchwyt do wyschnięcia!
- 
- 
-===== Warsztat cieżki ===== 
- 